Skip to content

FDE 5: Handoff

Handoff is when the build stops being yours and starts being the tenant’s. A good handoff leaves trained humans, kept documents, and a short list of owned open items. Never a hallway “you are good to go.”

  • Pilot ran with real users on real goals (not staged demos)
  • Environment spec, capabilities register, and approval matrix current (docs match reality)
  • Probe sequence re-run after the last change (nothing regressed)
  • Denial patterns reviewed and addressed (or explicitly accepted with rationale)
  • Connector states honest: connected vs. requested vs. deferred, each labeled
  • Open items ticketed with owners and dates, none verbal
Role Training Point them at
Users Run sessions, decide approvals, find records Tenant users, especially first session and approvals
Operators Supervise sessions, approval discipline, escalation User sessions path
Admins Membership, roles, settings, requests to PRESHai Tenant admins

Train with live pairing, not slide decks: new operators pair on real approvals before solo rights; new users run their first session with you watching.

  1. Scope doc (from Discovery): the agreed work, systems, exclusions.
  2. Environment spec (from Environment): context, tools, probes, connector states.
  3. Capabilities register (from Skills, tools and MCP): what is verified, when.
  4. Approval matrix (from Approvals): gates, roles, tuning log.
  5. Open items list: owner and date per item (connector requests, deferred scope, custom domain track).
  6. Rhythm one-pager: what the tenant does weekly (membership glance, denial-pattern review, request channel to the PRESHai team).
  • Week-2 check-in: sit in on live sessions, review recent approvals, catch drift early.
  • Measure the pilot success criteria from the scope doc. Did the observable outcome happen?
  • Feed platform learnings back: connector gaps, SDK friction, and recurring policy patterns go to ops and product, with examples, as the Ops and SDK sections expect.
  • Close or re-date open items. An open item without a date is a promise without a plan.